This rack supported mezzanine was designed and installed with one hundred percent used pallet rack materials, along with used bar grating. The only item that we needed to purchase was the mezzanine staircase.
Using pre-owned racking materials resulted in a discounted price, as well as the project being completed in less than 3 weeks. Lead times for new storage mezzanine can easily be 5 to 6 weeks out.